job-icon1-e1470171541813-3

Construction Scheduler

Inspire Excellence

PJS Group is seeking a Construction Scheduler to join our innovative team of professionals. We are a general and electrical construction contractor specializing in transportation infrastructure systems as well as heavy-highway, utility, bridge, and building construction. To learn more about us, please visit www.ipjs.us.

KEY RESPONSIBILITIES:
• Assisting the Project Manager in coordinating the overall planning and scheduling of activities
• Designing and implementing schedules and summary reports for assigned projects to ensure jobs are completed on time and within budget
• Tracking, analyzing, and reporting information in a timely manner to allow the Project teams the ability to manage their projects and monitor progress
• Maintaining the project risk register to ensure that risks are effectively managed to minimize their impact on the project

KEY REQUIREMENTS:
• B.S. in Civil Engineering or Construction Management
• Minimum of 5 years of experience in construction scheduling
• Ability to develop logical sequences of work, contract durations, and phasing
• Proficiency in Microsoft Office products
• Experience with Project Scheduling software such as Primavera or Microsoft Project required
• Motivated, independent, and self-sufficient when tasked with a project
• Highly organized and detail oriented with strong problem-solving skills
• Ability to multi task and work in a fast-paced environment
• Authorized to work in the US

KEY BENEFITS:
• Performance Based Profit Sharing
• Health, Dental, and Vision coverage
• Flexible Spending Accounts
• Paid Holidays, Vacation, and PTO Days
• 401k with company match
• Life and Disability Insurance

Please send resume and salary expectations to hr@ipjs.us

Tags: No tags

Add a Comment

Your email address will not be published. Required fields are marked *